Bomba worthington 6 ln 18

These instructions must be read prior to installing, operating, using and maintaining this equipment. Page 2 of 36 flowserve. Additional sources

These instructions must be read prior to installing, operating, using and maintaining this equipment. Additional sources Replacement parts see 6. Flowserves products are designed, developed and manufactured with state-of-the-art technologies in modern facilities. The unit is produced with great care and commitment to continuous quality control, utilising sophisticated quality techniques, and safety requirements. Flowserve is committed to continuous quality improvement and being at service for any further information about the product in its installation and operation or about its support products, repair and diagnostic services.

Bomba worthington 6 ln 18

.

Where there is a risk from such tools or materials, maintenance To avoid the potential hazard from random induced must be conducted in a safe area. Never use air or compressed inert gas to clean clothes. Gland packing may be fitted as an option.

.

When you see the email, be sure the click on the link to verify your email address. Used Worthington 5. Used gear pump, 3" suction and discharge, CF8M material, rpm, psi. Power Zone is a leading global supplier of new, used and reconditioned pumps for sale. Our inventory of pumps includes multi-stage centrifugal pumps, positive displacement pumps, reciprocating pumps, single stage centrifugal pumps and screw pumps in a variety of design standards including API Centrifugal Pumps, API Reciprocating Pumps and API Rotary Pumps. Industrial pumps perform a critical role in a wide array of industries. Power Zone provides a robust selection of heavy-duty, high-performance pumps engineered to deliver exceptional durability and reliability under the most extreme operating conditions.

Bomba worthington 6 ln 18

Academic year: Share "Manual bombas Worthington. Ver texto completo ahora. Fuerzas y momentos 4.

Bet meaning slang

When leakage reaches vibration. See section 5, Commissioning start-up, operation and shutdown. Instructions and or Flowserve if unsure of correct method or arrangement. The correct functioning of the shaft seal must be checked regularly. The instructions may not take into account local regulations; ensure such regulations are observed by all, including those installing the product. Let liquid run out until free outlet valve closed for a period longer than 10 from air bubbles. If bearing temperatures are to be monitored it is essential that a benchmark temperature is recorded at the commissioning stage and after the bearing temperature has stabilized. Check method of regreasing. Our specialist service personnel can help with preventative maintenance records and provide Before working on the pump, take measures to condition monitoring for temperature and vibration to prevent an uncontrolled start. The correct method depends on the size of the pump unit, its location and noise vibration limitations.

.

The specific safety markings are: This is a summary of conditions and actions to prevent injury to personnel and damage to the environment and to equipment. In addition the housings should be no certification. Consult Flowserve for preservative actions when a longer storage period is needed. Put a warning board on the starting device with the words: "Machine under repair: do not start". This is particularly relevant if the pump is handling a flammable liquid. TIR involving high liquid temperatures, the unit should be run at the actual operating temperature, shut down When checking parallel alignment, the total indicator and the alignment checked immediately. Alarm and trip values for installed pumps should be based on the actual measurements N taken on site on the bearing housings of the pump in the fully commissioned as new condition. Speed too high. To avoid distortion, the pump unit should be lifted as shown. In some cases where the alignment cannot be achieved it will be necessary to move the pump before recommencing the above procedure. For 2 years operation: 1 x - set of bearings line and thrust Non-metallic gaskets incur creep 2 x - sets of gland packing relaxation — before commissioning the pump, check 2 x - shaft sleeves and retighten fasteners to tightening torques stated. P u lle r Replace as necessary. For the masses of the pumps bare end of shaft see table 2. It is important that checks are made with your nearest Flowserve office if changes in viscosity are planned. Never run a mechanical seal dry, even for a short time.

2 thoughts on “Bomba worthington 6 ln 18

  1. I consider, that you are mistaken. Let's discuss it. Write to me in PM, we will communicate.

Leave a Reply

Your email address will not be published. Required fields are marked *